During the construction of a new residential district in the hills of Geneva, called “Les Cèdres de Cologny”, a surface area of 32,000 m2 was covered with scaffolding. Started in 2014 and consisting of more than 262 housing units, it was the largest housing project in the canton.

The mass of scaffolding, for which ECHAMI was responsible for the assembly and dismantling in less than 30 months, was spread over 11 different towers. Logistics and transport flows accounted for the bulk of our costs, with our teams moving more than 630 tons of equipment for this project.

In addition to providing the supplies and materials, qualified and highly organized personnel were enlisted on-site to match the pace set by the seven cranes and thus ensure the safety of the 300 or so workers present daily.